The capital project’s scope of work addresses needs in five key areas:
1) Building Conditions Survey & Code related items required by NYS,
2) building exterior & roofing,
3) mechanical/electrical/plumbing,
4) site work, and
5) academic programming needs.
The outline below provides a brief overview of the major work items planned at each building.
High School $8,936,300
• Pavement reconstruction and sidewalk replacement
• Resurface and expand existing track
• Replace overhead electrical lines with underground
• Improve handicap accessibility at toilet rooms
• Asbestos abatement
• Refinish gym floor
• Masonry restoration
• Replace existing pool roof
• Replace original steam boilers with new,
• more energy-efficient boilers
• Replace miscellaneous electrical panels
• Replace overhead stage rigging
• Renovate basement locker room
• Replace non-code compliant press box and structure
• Concession stand upgrades
• Greenhouse improvements
Middle School $9,984,300
• Replace 14 heating / ventilating units
• Install new handicap-accessible Nurse’s toilet
• Kitchen ventilation
• Upgrade / replace water services
• Replace all corridor lockers
• Asbestos abatement
• Corridor flooring replacement
• Replace entire roof
Colden Elementary $1,628,200
• Pavement reconstruction and sidewalk replacement
• Kitchen hood and piping replacement
• Asbestos abatement
• Replace all carpet with new vinyl flooring
• Roofing repairs
• New fire alarm system
Springville Elementary $6,847,500
• Pavement reconstruction and sidewalk replacement
• Replace deteriorated site lighting with energy-efficient
• LED lighting
• Repave primary and intermediate playgrounds
• Replace vinyl asbestos flooring with new vinyl flooring
• Refinish gym and stage wood floors
• Partial roof replacement
• Masonry restoration
• New energy-efficient classroom ventilators and casework
• Replace original boilers with more energy-efficient boilers
• Replace gymnasium and cafeteria ceiling and lighting
District Offices $398,700
• Roof replacement
• Upgrade toilet rooms for handicapped accessibility