The changes to our elementary building are similar to those I talked about yesterday in our high school building.
- Replace the master clock system with a wireless clock system.
- Intrusion detection devices integrated with video surveillance.
- Code compliant hardware locksets for all classroom doors that allow teachers to lock their classroom doors quickly in the event of an emergency, without using a key.
- A handicapped toilet room in the occupational/physical therapy multi purpose room.
- Smartcard technology security access that interfaces with our video surveillance systems and replace our analog cameras with IP, integrating our two systems.
- Replacement of boys toilet room urinals.
- 18,000 square feet of carpet replacement.
- Stage lighting control updates in the gymnasium.
- Preparing for a conversion to hot water heat in a future, phase #2 project: crawl space abatement, steam piping, ventilator and pump conversion.
- Replacement of HVAC that is at end of useful life.